At 6:15 a.m. workers began claiming their position on the scaffolding for the roof pour:

Concrete was lifted to the roof in 5 gallon buckets, passed person to person, until the pour was complete.

Bucket of concrete about to ascend:Cement mixer operators:
Those at the bottom of the scaffolding took the brunt of the spilled concrete:
Finally done!Maze of electrical wires:
Plumbing:This week we poured the downstairs floors:
Getting closer to looking like a house: