Below they are pouring the bond beam that sits on top of the footings. The footings are 2 feet deep and three feet wide (About 16 tons of concrete):
In order to run electrical and plumbing, channels had to be molded into the bond beam to allow space for wiring and pipes to enter the block from under the floor. We cut 2 1/2" PVC in half, then poured around them to create the hollow space. It was difficult anticipating all the areas where the channels needed to be located. If we miss one, there will be a lot of work chipping out channels with a chisel:
(The black coating is a type of tar to waterproof concrete that will be below ground)
At every location where wires or pipe enter or exit the foundation, we had to leave 4" pipe, or foam blocks (that are later removed to create a hole) molded into the bond beam. We had to be absolutely sure they were in the correct location. There's no cutting through 8" of solid concrete and steel:
It took 5 truck loads of dirt to fill the raised foundation.
They used 5,000 gallons of water to soak the fill dirt. It will soak for three days before being compacted:
These are bags of tiny foam pellets that will be poured into the hollow cells of the block for insulation:
Now work begins on the footings for the patio. Under the mound (in the middle of the trench) is a giant rock that they've been chipping away by hand for a couple of days now.

This will eventually be the morning view from our bedroom: