Things have been moving slowly as the steel cages are being made for the large bond beam that will go around the entire first floor. Tomorrow all the electrical for the second floor will be run through this steel cage en-route to the second floor. There's only one chance to get it right, because after the beam is poured, there's no going back. Tomorrow will be a stressful day checking and double checking to assure all the second floor wiring and plumbing is stubbed our correctly.
The ocean side windows and doors are more visible now:
The living room and arch column posts are more defined:
Yesterday the foam insulation that will be used in the roof arrived:
After the wiring is done, they will pour the bond beam. After that, the patio cover posts will be constructed and the patio cover will be poured before the first floor roof is formed up.