skip to main |
skip to sidebar
Starting to Look Like Something
We finally get a little break, all the lower electrical is finished. Now we have to wait until they get the walls up to the 9' level, then all the recessed, and ceiling light wiring has to be run.
It's been so windy (two weeks with wind over 35mph), that it's been difficult to lay block. The windward walls had to be braced against the wind with 4x4 posts until the mortar dried.
There's somewhat of an entrance door. The wood form above the door is the mold for the poured concrete beam above: We can tell where the living room windows will be:Interior rooms:
Kitchen:

No comments:
Post a Comment